{"id":414,"date":"2010-08-05T11:30:08","date_gmt":"2010-08-05T11:30:08","guid":{"rendered":"http:\/\/blogs.wabash.edu\/fyi\/2010\/08\/05\/turf-crew-expected-in-monday-morning\/"},"modified":"2010-08-05T11:30:08","modified_gmt":"2010-08-05T11:30:08","slug":"turf-crew-expected-in-monday-morning","status":"publish","type":"post","link":"https:\/\/blog.wabash.edu\/fyi\/2010\/08\/05\/turf-crew-expected-in-monday-morning\/","title":{"rendered":"Turf Crew Expected in Monday Morning"},"content":{"rendered":"<p><u><i>Friday Update <\/i><\/u><i>&#8211;<\/i> There isn&#8217;t much news today&nbsp;on the football field construction front<i>. <\/i>A crew is removing the ramp that allowed heavy machinery to move over the running track. The scoreboard is about 80 percent complete with some trim and signage yet to go.<\/p>\n<p>What we did learn this morning is the FieldTurf crew is putting finishing touches on a field installation in Michigan and expected to arrive Monday morning to start on Hollett Little Giant Stadium. The turf is here, the field is ready for installation.<\/p>\n<p><i>Kyle Bender &rsquo;12 <\/i>&ndash; Turf arrived Thursday morning around 9:00 a.m. Check back often to see extended coverage of the progress over the next few days.&nbsp;<\/p>\n<div>The preseason 24th ranked (<b><a target=\"_blank\" href=\"http:\/\/www.d3football.com\/top25\/2010\/week-0\"><font color=\"#800080\">by D3Football.com<\/font><\/a><\/b>) Little Giants open the season on Saturday, September 11 at home against the College of Wooster.&nbsp;<\/div>\n<div>&nbsp;<\/div>\n<div>Check out the field&#8217;s progress in photos: Thursday morning, <strong><a target=\"_blank\" href=\"http:\/\/www.wabash.edu\/photo_album\/home.cfm?photo_album_id=2464\">click here<\/a><\/strong>; Thursday afternoon, <strong><a target=\"_blank\" href=\"http:\/\/www.wabash.edu\/photo_album\/home.cfm?photo_album_id=2465\">click here<\/a><\/strong><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Friday Update &#8211; There isn&#8217;t much news today&nbsp;on the football field construction front. A crew is removing the ramp that allowed heavy machinery to move over the running track. The scoreboard is [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-414","post","type-post","status-publish","format-standard","hentry","category-athletic-fields-construction"],"w_featured_image_url":"","_links":{"self":[{"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/posts\/414","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/comments?post=414"}],"version-history":[{"count":0,"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/posts\/414\/revisions"}],"wp:attachment":[{"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/media?parent=414"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/categories?post=414"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/tags?post=414"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}