{"id":409,"date":"2010-07-16T14:23:52","date_gmt":"2010-07-16T14:23:52","guid":{"rendered":"http:\/\/blogs.wabash.edu\/fyi\/2010\/07\/16\/goalposts-added-to-field\/"},"modified":"2010-07-16T14:23:52","modified_gmt":"2010-07-16T14:23:52","slug":"goalposts-added-to-field","status":"publish","type":"post","link":"https:\/\/blog.wabash.edu\/fyi\/2010\/07\/16\/goalposts-added-to-field\/","title":{"rendered":"Goalposts Added to Field"},"content":{"rendered":"<p><i>Kyle Bender &rsquo;12<\/i> &ndash; The long jump and pole vault areas are near completion, a base layer of gravel is being spread, and Wabash College is almost ready for FieldTurf to be installed!<\/p>\n<div>To see the construction progress, along with the newly installed goalposts, <strong><a target=\"_blank\" href=\"http:\/\/www.wabash.edu\/photo_album\/home.cfm?photo_album_id=2443\">click here<\/a><\/strong>.<\/div>\n<div>&nbsp;<\/div>\n<div>On Friday, workers continued installing the long jump runway and pit.&nbsp;The crew reported that Wabash will have one of the largest landing pits they have ever installed &ndash; over 32 feet in length.&nbsp;<\/div>\n<div>&nbsp;<\/div>\n<div>Turf is scheduled to arrive anytime between July 19 and 21 and will be installed immediately.&nbsp;The crew will work through the weekend to finish the base layer of gravel needed prior to the turf installation.&nbsp;The scoreboard is also expected to be delivered July 21.<\/div>\n<div>&nbsp;<\/div>\n<div>In the photo album, there are also several pictures providing an update at the baseball field.&nbsp;The site has been completely cleared of all trees and a storm sewer and drainage system is currently being installed.&nbsp;Sod is scheduled to be delivered September 1.&nbsp;<\/div>\n<div>&nbsp;<\/div>\n<div>While countless truck loads of dirt have been removed from the football field, the construction crew recently made an exciting, yet unique discovery.&nbsp;They found an 1899 dime lying in the dirt at the 50 yard line. &nbsp;&nbsp;Check out the Archives in the fall to see the dime!<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Kyle Bender &rsquo;12 &ndash; The long jump and pole vault areas are near completion, a base layer of gravel is being spread, and Wabash College is almost ready for FieldTurf to be [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-409","post","type-post","status-publish","format-standard","hentry","category-athletic-fields-construction"],"w_featured_image_url":"","_links":{"self":[{"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/posts\/409","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/comments?post=409"}],"version-history":[{"count":0,"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/posts\/409\/revisions"}],"wp:attachment":[{"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/media?parent=409"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/categories?post=409"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/tags?post=409"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}