{"id":397,"date":"2010-06-17T13:27:11","date_gmt":"2010-06-17T13:27:11","guid":{"rendered":"http:\/\/blogs.wabash.edu\/fyi\/2010\/06\/17\/construction-crew-pouring-cement-for-drainage\/"},"modified":"2010-06-17T13:27:11","modified_gmt":"2010-06-17T13:27:11","slug":"construction-crew-pouring-cement-for-drainage","status":"publish","type":"post","link":"https:\/\/blog.wabash.edu\/fyi\/2010\/06\/17\/construction-crew-pouring-cement-for-drainage\/","title":{"rendered":"Construction Crew Pouring Cement for Drainage"},"content":{"rendered":"<p><i>Kyle Bender &rsquo;12 &ndash;<\/i> It has been not quite as busy at the football field construction site, where new FieldTurf surface is being installed.&nbsp;<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" align=\"left\" width=\"275\" height=\"234\" alt=\"\" src=\"http:\/\/blogs.wabash.edu\/www2images\/blogpic.jpg\" \/>Warm weather has now dried the field and work resumed Thursday morning.&nbsp;Preparation for a cement drain&nbsp;running along the inside of the track oval is being made.&nbsp;For a glimpse of the progress, <strong><a target=\"_blank\" href=\"http:\/\/www.wabash.edu\/photo_album\/home.cfm?photo_album_id=2416\">click here<\/a><\/strong>.<\/p>\n<div style=\"margin: 0in 0in 10pt\">Project Manager Mike Strolle said the construction remains on schedule, as rain days were built into the expected August 1 deadline.&nbsp;He also said once the concrete drains are finished and a layer of gravel is laid on the field, rain will not be as big of an issue.&nbsp;<\/div>\n<div style=\"margin: 0in 0in 10pt\">Check back next week to see a video of the baseball field and hear Head Coach Cory Stevens and members of the team about how the new stadium will affect their program.<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Kyle Bender &rsquo;12 &ndash; It has been not quite as busy at the football field construction site, where new FieldTurf surface is being installed.&nbsp; Warm weather has now dried the field and [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-397","post","type-post","status-publish","format-standard","hentry","category-athletic-fields-construction"],"w_featured_image_url":"","_links":{"self":[{"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/posts\/397","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/comments?post=397"}],"version-history":[{"count":0,"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/posts\/397\/revisions"}],"wp:attachment":[{"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/media?parent=397"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/categories?post=397"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.wabash.edu\/fyi\/wp-json\/wp\/v2\/tags?post=397"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}